Lisi lake environmental, infrastructure and socio-economic assessment

Period of Implementation: From: (January/2020) To: (July/2020)
Donor: BAUdesign – Bureau of Architecture and Urban Design
Main Objectives: The overall objective of this consultancy is to develop report on the environmental (hydrological) infrastructure (electricity and natural gas) and socio-economic assessment of the Lisi lake watershed
Main Results: Result of the project:
• Report on the environmental, infrastructure and socio-economic assessment of the Lisi lake watershed